LujyEPMS™ module

Engineering Project Management (LujyEPMS™) — every discipline, one live picture

Run engineering and construction projects of any scale — from 100 to 10,000+ elements across 20+ disciplines — through one hierarchy: Project, work packages, elements, tasks and steps, with progress rolling up automatically.

Who it's for

  • Project managers scoping and controlling multi-discipline engineering projects.
  • Engineering managers distributing work across packages, elements and engineers.
  • Discipline engineers (civil, mechanical, electrical) executing assigned tasks and steps.
  • Project coordinators tracking deliverables, submittals and approvals.
  • Organizations running complex projects — typically 500+ elements, 3+ disciplines or $10M+ budgets.

Key capabilities

  • Six-level project hierarchy — Project, work-breakdown structure, package, element, task and step, with unlimited WBS nesting guarded by depth warnings and circular-reference detection.
  • One-click task creation — assign work across packages or elements and get one step generated per element automatically.
  • Binary, trustworthy progress — steps are done or not done; task status transitions automatically while preserving man-hours, including a "Not Applicable any More" state.
  • Weighted progress roll-up — quantity, cost and time weights (with manual override) aggregate element progress to project level across five progress dimensions.
  • Engineer-focused access — each engineer sees only the projects and steps from their own task assignments, updated in real time.
  • Protected scope — packages with active tasks cannot be deleted; affected tasks are listed with navigation instead.
  • Built-in time tracking — time entries with stopwatch flow, recalculation, employee and engineer calendars, and leave handling.
  • Distribution control — recalculate package distribution and check variance from dedicated actions.

How it works

  1. Create the project and structure it into discipline-based work-breakdown structures.
  2. Define packages and elements with planned hours and costs — totals roll up automatically.
  3. Assign tasks to engineers; steps generate per element on save.
  4. Execute — engineers complete steps and log time against their own filtered views.
  5. Control — recalculate progress, review variance, and report from project level down to the single step.

Entities & reports

The module manages projects, WBS items, packages, elements, tasks, steps, deliverables (optional, referenced by elements), submittals, engineers, status definitions and templates. Headline reports: hierarchical progress reports, time and man-hour reports, engineer assignment reports, and calendar views for employees and engineers.

Integrations

Aligns with ERP project accounting, HR and payroll for engineer records, and inventory for material-driven elements. Schedules render through the LujyTec Gantt engine on desktop and web.

Deployment & licensing

LujyAPP™ runs as a Windows desktop app and a web app, on your servers or in the cloud, licensed through the LujyTec Licenser. Data preparation uses a guided Excel template so existing project structures migrate cleanly.

What's new

  • In production since October 2025 — the core six-level hierarchy with weighted progress and engineer access control.
  • Task time tracking with stopwatch flow, time entries and calendar views.
  • Data-integrity guards: circular-reference detection, package-deletion blocking and WBS depth warnings.

Roadmap (Coming soon)

  • Independent security audit of engineer access filtering, with published results.
  • Load and performance validation at scale (concurrent users, list paging, filtering latency, full-project recalculation).

FAQ

  • Will engineers drown in other teams' data? No — each engineer sees only projects and steps tied to their own task assignments, enforced across all views and updated in real time.
  • How is progress actually calculated? Completed steps drive element progress; quantity, cost and time weights (overridable per level) roll it up to project level.
  • Can we migrate existing project structures? Yes — a data-preparation guide with an Excel template maps your current WBS, packages and elements into EPMS.
  • Who can change statuses or delete work? Access follows LujyAPP™ role-based security with audit trail, validation rules and guarded deletions.