Asset Management (LujyEAM™) — uptime by design, not luck
Status: Under Renovation. The LujyEAM™ module is being rebuilt on LujyAPP™ from its legacy VB.NET design — register, preventive plans, repair orders, spares and depreciation in one lifecycle.
Who it's for
- Maintenance managers planning preventive routines.
- Technicians executing repair orders with spare parts.
- Asset owners tracking lifecycle cost and condition.
- Finance teams depreciating the asset base.
Key capabilities
The LujyEAM™ module shell is registered on the LujyAPP™ platform and its legacy VB.NET design is archived as the renovation baseline. Everything it ships inherits the platform guarantees:
- Role-based access — planners, technicians and owners separated.
- Full audit trail — every work order and movement traced.
- Validation and approvals — maintenance sign-offs enforced.
- Reports and dashboards — downtime, backlog and cost views live.
How it works (designed workflow — under renovation)
- Register every tangible asset with location.
- Plan preventive maintenance routines.
- Repair through work orders consuming spares.
- Account — depreciate and review lifecycle cost.
Entities & reports
Planned records: asset register, maintenance plans, repair orders, depreciation runs and spare-parts stock. Reporting on the platform engine: downtime, backlog and asset-cost views.
Integrations
Works standalone inside LujyAPP™. Spare-parts issue from LujyStore™ and depreciation posting through Accounting Core are scoped at deployment.
Deployment & licensing
LujyAPP™ runs as a Windows desktop app and a web app, on your servers or in the cloud, licensed through the LujyTec Licenser. Arabic and English interface included.
What's new
- Under renovation: legacy VB.NET EAM design archived as baseline; LujyAPP™ rebuild scoped and in progress.
Roadmap (Coming soon)
- Asset register with preventive maintenance plans.
- Repair orders with spare-parts inventory.
- Depreciation calculation with lifecycle reporting.
FAQ
- Is LujyEAM™ available today? The LujyEAM™ module is under renovation — talk to us about timing for your site.
- Preventive or reactive? Both — planned routines plus logged unscheduled repairs.
- How are spares handled? Parts consumed on work orders with stock control in scope.